Starting 6 p.m. Monday, April 8th, I-376 will be down to two lanes of traffic in each direction between the Churchill/Route 130 (Exit 79B) interchange and the Monroeville/Route 48 (Exit 84A) exit through late November. Additionally, I-376 will be reduced to a single-lane of traffic weeknights from 9 p.m. to 5 a.m. in the same location. Crews will conduct concrete median barrier replacement, roadway rehabilitation, expansion dam replacements, concrete rehabilitation, modified concrete overlays, paving, and bridge painting. Complete information can be found here.